沃恩 Municipal Transformer Station #6 Class EA

关于

开云体育app公司保留了WSP加拿大公司 .. (WSP) to prepare a Class Environmental Assessment (EA) study for a proposed 230 kiloVolt (kV) Municipal Transformer Station (沃恩MTS #6) in 沃恩 with the capacity of 170 Mega Volt Ampere (MVA), which will connect to an existing 230 kV transmission line. The new 沃恩MTS #6 will transform the high voltage (230 kV) to distribution voltage (27.6 kV) and provide capacity to an Alectra customer’s new facility with a maximum demand of 108 MVA with a planned operation in 2027.

目的

An undisclosed customer has proposed a 108 MVA data center in the Langstaff Road/Hwy 27 area in 沃恩. Alectra does not have capacity in the current system to meet the forecasted customer demand beyond 2026. In order to meet the forecast capacity deficiency, additional transformation and feeder capacity needs to be operational by Q4 2026. 

The customer’s maximum demand is forecasted to be 108 MVA and will require ten (10) 27.6 kV feeders to meet 100% redundant supply needs. It is proposed that a Bermondsey type transformer station is required to meet the customer’s long-term needs. A typical Bermondsey type transformer station has two 125 MVA transformers, twelve 27.6kv馈线,170mva容量. Figure 1 below is an example of a 典型变电站.

典型变电站
图1:典型变电站.
图2: Existing Hydro One 230 kV line and towers located west of the 沃恩MTS #6 study area.

The proposed site is located at the northeast corner of Line Drive and Langstaff Road. The line connection will involve the installation of 230 kV cables in an underground duct bank to connect the station to the existing Hydro One 230 kV transmission line and towers located west of the study area (Figure 2 above). 拟建地下230千伏电缆, which will be approximately 425 metres (m) long, will convey electricity from the existing Hydro One tower located southwest of the study area to a new municipal transformer station in 沃恩, 然后是27.6 kV underground duct bank line will convey electricity to the future data facility.

这个过程

The Study is subject to the Class EA for Minor Transmission Facilities (Class EA for MTF) in accordance with the Ontario Environmental Assessment Act. The Class EA for MTF is a streamlined process for planning transmission projects that have a predictable range of environmental effects and feasible mitigation measures that can be applied (www.hydroone.com/ClassEA). The Class EA process includes public and agency consultation, 土著社区参与, an assessment of the potential effects of the proposed project, 以及缓解措施的确定.

Within the Class EA for MTF there are two tiers of assessment corresponding to project scale and potential for environmental effects. 这些包括:

  1. 筛选程序;及
  2. 全类EA流程.

The Screening Process is a streamlined process for smaller scale projects with minimal environmental effects (confirmed upon satisfying 16 screening criteria). Based on completing the consultation activities and fulfillment of the 16 screening criteria, 本研究将遵循筛选程序.

In the months ahead, we will collect environmental and technical data to assess the study area. We will also gather input on the proposed project from residents, 原住民社区, 当地企业, 政府机构, 利益集团. Once the Class EA process is successfully completed, construction could commence as early as May 2025, 并将于2026年底完工.

阿莱克特拉·沃恩MTS #6级EA

沃恩MTS #6类EA -重要文件

View key documents related to the 阿莱克特拉·沃恩MTS #6级EA project including maps, 公众注意到, 以及展示材料.

你的反馈

沃恩MTS #6 Class EA – Contact the Project Team

Get the answers you’re looking for from the experts working on the 沃恩MTS #6 Class EA.

If you have questions, please contact us so that a member of our team can help you.

Riaz Shaikh, P.英格.
分销系统计划经理
阿莱克特拉公用事业公司
电话: (905) 798-2930
电子邮件: project_VTS6@aaronandterese.com

Nadia Dabagh
咨询和参与主管
WSP加拿大公司.
电话: (289) 835-2519
电子邮件: project_VTS6@aaronandterese.com

评论形式

Is 你的位置?